Standard Description
Outfitted using the zero leak bidirectional checking sole-noid valves, this electrical power unit is built to the operation of two independent circuits. Which are respectively to the principal and subordinate platforms of the double scissors lift. Two cut-off valves are utilised for lowering the machine manually in case of energy loss. If far more independent circuits are needed for the application please get hold of us for availability.
Remark: one. Please seek advice from our revenue engineer for that unique pump displacement, motor power or tank capability.
2. CSA or UL certified motors are available upon request.
Particular Notes
one. The AC motor is of S3 duty cycle, which can only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean each of the hydraulic elements concerned in advance of installation of the energy unit.
3. Viscosity in the oil shoud be 15~46 cst,and also the oil should be clean and absolutely free of impurities,N46 hydraulic oil is proposed.
four. The electrical power unit should really be mounted vertically.
five. Check the oil degree from the tank following the first operating with the electrical power unit.
six. Oil shifting is required soon after the preliminary 100 operation hrs,afterwards after every 3000 hrs.